The following is the final program:
Thursday, 29 April 2010
Final Program
The chief programmer presented the initial final program to the group the day before the final test, though on occasion the buggy would stop when it lost the posistion of the track. As a result the project manager suggested a feed back reversing system whenever the central track relation sensor recorded a white background. This was then installed to produce the final program, which was then calibrated by the programmer.
The following is the final program:


The following is the final program:
Labels:
Mark Hawkins,
Program Design Process,
Sandra Donohoe
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment